Defining
the Maintenance Level
-
Maintenance by Plan vs. Maintenance by
Default
-
Equipment Reliability and Availability
-
Building a Maintenance Management Plan
-
Setting and Achieving Goals
Planning and Estimating
-
Construction Estimating Methods
-
Methods Time Measurement
-
The Planning Thought Process - A common
sense approach to maintenance estimates
-
Estimates Based on Past Performance
-
Improving the Accuracy of Estimates
-
Work Packages
-
Building Generic Plans
-
Solving Material Problems
Preventive and Predictive Maintenance
-
Preventive Maintenance Defined
-
Mandatory and Discretionary Preventive
Maintenance
-
Prioritizing Candidates for Preventive
Maintenance
-
Building Credible Preventive Maintenance
Procedures
-
Sources of Generic Preventive Maintenance
Procedures
-
Audits for Procedures and Programs
-
Converting Preventive to Predictive
Maintenance (PDM)
-
The Spectrum of Predictive Maintenance
-
Establishing Engineering Limits
|
The
Scheduling Process
-
Prioritizing Maintenance Work
-
Dealing with Emergencies
-
Plotting the Backlog
-
Allocation Scheduling Method
-
Priority Numbering Systems
-
Weekly and Daily Schedules
Critical Path Methods for Maintenance
-
Definitions and Conventions
-
Diagramming Methods
-
Identifying the Precedent Logic
-
Dealing with of Float (Slack)
-
Load Leveling Resources
-
Turnarounds, Shutdowns and Outages
Metrics, Indices, Reports and Graphics
-
Streamlining Data Collection
-
Metrics and Indices that Count
-
Graphically Displaying Metrics
-
Maintenance Management Reports
 |